Highly durable areas of the roadway surface at bus stops , constructed in September 2018 and May 2019, laying 4 cm AC 11 asphalt mix, with the use of PmB blended with Selenizza SLN, addressing the [...]
5 August 2019 Read moreRutting problems resolved thanks to a 2 cm top layer of SMA 5 with Selenizza, over 2 cm Stress Absorbing Membrane Interlayer
2 August 2019 Read more