Our Projects

5 August 2019

Bus stops – Riga (Latvia)

Highly durable areas of the roadway surface at bus stops, constructed in September 2018 and May 2019, laying 4 cm AC 11 asphalt mix, with the use of PmB blended with Selenizza SLN, addressing the common issue of asphalt distortion at bus stops

In 2020, a top asphalt layer of Selenizza- based bituminous mixture will be installed on a highway slow traffic lane in Riga, to prevent the rutting problem